HEIM PAL CHILDREN HOSPITAL

DesignTeam:
architecture: Sándor Dúzs and Zsófia Schaendl / ArkTOON Architects, Kata Heigl, Tamás Havasi, structure: Tamás Kaknics, Health Care consultant: Gabriella Bondor, electrical eng.: Ferenc Kelemen, mechanical eng.: László Kolarovszki

Jury assessment and recommendation:

"I. Siting

• external traffic arrangement and connections:
The planned "B" building is located in the continuation of the staircase of the "A" building from the SOTE side, at the same time, the pedestrian connection from the existing lobby of the "A" building, a new one provided via a built-in neck member - only on -1 and the ground floor. A good solution the Jury considered that the economic approach to the building is for an ambulance it can be reached next to the site boundary on the SOTE side, and the underground garage opens from here ramps of the existing roads or porta, using economic entrance.

• long-term development / staging:
Due to the arrangement of the building, the first phase can be implemented without demolition.
Buildings "C" and "D" will be demolished in the second phase. The new internal medicine block a
It is realized on the site of building "C", however, it is connected through the planned building "B" to (ground level) contingent. No further connection is established at higher levels. The lot is Delej street on the side, a continuous green area is formed, and thus the Delej utca has a favorable effect to the main entrance.

• green space, parking, land use:
The parking needs of the first phase are met by building "B" -2. and -1. solve it at level (85 pcs).
In addition to the contiguous green surfaces on the square, it was checked on the roof surface of the podium building created a playground. The development of the site results in an economical use of land.

II. Architecture

• siting, massing:
The planned building meets the requirements of the existing District Urban Planning and Construction Regulations
it fits. The building is a two-story pie containing operating theaters and an emergency department
placed, including cantilevered five-story "H" floor plan care units
consists of mass. The relationship between the new building and the connecting neck member with the existing "A" is debatable.
building, the emerging courtyard (licht hof) is not worthy of generous mass education.

• fitting into the environment:
The planned building – especially with the extension – is decisive and favorable as a second space wall close Nagyvárad Square from the city side.

• functions, floor plan editing
The floor plan organization of the building is clear and clean. The operating theater and the nurses' station are praiseworthy and the creation of a child employer.

III. Medical professional judgment
The project places the center of gravity units in a two-story, above-ground, pie-like structure, on which an H-shaped tower accommodating the function of a hotel is built.
The call for tenders fulfills all requirements.
The building can be implemented with continuous hospital operation.
The placement of the center of gravity units is appropriate, in all cases the minimum conditions their design is appropriate.
Ambulances can approach the SBO in the middle of the building, outpatients can approach it from building "A", therefore, the placement of two dispatch desks is necessary. The department is the elevator-staircase-lobby complex splits it into two. The layer is placed in the other wing of the building. The diagnostic 4 units could have been placed more expediently. The elevator is from the "A" building its approach can only be through the SBO, which is not acceptable.
The hotel function is properly designed, and the number of service rooms is satisfactory.
The wet rooms in each ward open into the air space of the ward. Many servers
for a room (medical, operating room, etc.) do not plan a wet room.
Advantages: the building can be built without demolition and while maintaining operations. The functions its placement is expedient and professional. The professional wishes are fulfilled, the emergency operations are a they are isolated from the other operating theaters of the block.
Disadvantages: SBO diagnostics and bed placement could be more appropriate. Building "A" covers it transit through the SBO is not accepted. The number of lifts seems to be less than desirable. There would be useful to have a direct connection between the helicopter runway and the centre of gravity units.

The processing and architectural formulation of the project is correct and thoroughly thought out.
Like the floor plans, the facades are consistent.
The Judging Committee, with regard to the architectural and professional values ​​of the project, recommends second prize."